| 1. | Present status and prospect of water well construction technology 水井工程技术现状与展望 |
| 2. | Experience of sunk well construction in the basis of basement 高层建筑地下室基础沉井施工经验浅谈 |
| 3. | Sands and gravels for well construction - requirements and testing 水井建造用砂和砂砾.要求和检验 |
| 4. | Application of acid - fracture technology in geothermal well construction 酸化压裂工艺在地热井中的应用 |
| 5. | Application on drilling new process in well construction in teh areas of shortage of water in the western of shanxi 钻探新工艺在山西西部缺水地区施工中的应用 |
| 6. | Contract procedures for building works - part c : general technical specifications for building works ; well construction works 建筑工程承包程序.第c部分:建筑工程一般技术规范.井 |
| 7. | Abstract : in this paper , designs for foundation pit drainage , concrete pouring as well as side wall form , etc in shaft well construction are discussed 文摘:介绍了竖井施工中有关基坑排水、混凝土浇筑以及侧壁模板等设计问题。 |
| 8. | Under this circumstance , the blasting design is reasonably made and the blasting construction is precisely organized as well , and then the better construction result is obtained at last 根据实际情况,合理进行厂房边坡石方爆破设计,精心组织爆破施工,取得了较好的效果。 |
| 9. | The best construction method had been used to create 3d model of mold . moreover , the 3dcad system is developed in ugh developing environment using vc + + 6 . 0 as the developing tools . 2 最后,在三维建模软件ug 17 . 0的二次开发环境中以vc 6 . 0为开发工具,开发出满足实际生产需要的挤压分流模三维cad系统设计软件。 |
| 10. | ( 3 ) seepage model for 3 - d fractured rock masses is introduced to seepage problem of underground powerhouse . the research is more intact than before , which serve better construction in practice ( 3 )将三维裂隙岩体渗流理论模型引入到地下厂房洞室群的渗流问题,使地下厂房洞室群渗流场问题的研究更加完整,能够更好地服务于实际工程的建设。 |